What is a basis of schedule?

What is a basis of schedule?

The schedule basis is a document that defines the basis for the development of the project schedule and assists the project team and stakeholders in identifying any key elements, issues and special considerations (assumptions, exclusions, risks/ opportunities, etc.).

What is a Level 2 Schedule?

Level 2 Schedule Management Summary, also called a Summary Master Schedule (SMS). Maintained as a summarisation of the Level 3 Project Coordination Schedule(s). It depicts the overall project broken down into its major components by area and is used for higher-level management reporting.

What is a schedule management plan?

The Schedule Management Plan defines how the project schedule is managed throughout the project lifecycle. The plan provides guidance and sets expectations for project schedule policies and procedures for planning, developing, managing, executing, and controlling the project schedule.

What is an Inchstone schedule?

Termed “inchstones” because they work within the existing construction milestones, these indicators are carefully chosen to enable the owner to identify potential delays at points early enough in the schedule to correct, and also to maintain scheduled dates and confirm contract compliance.

What is recovery schedule?

Recovery schedule denotes that schedule which is intended to gain back time already lost (to-date). Most revised baselines include recovery efforts built-in. On a good day milestone dates are reset until 0d float is the longest path. A recovery schedule should necessitate a narrative and report of changes made.

How do you bring a failing project back on track?

Here are ten tips and tricks for getting projects of all sizes back on track:

  1. Recognize early warning signs and act fast!
  2. Find out what’s gone wrong.
  3. Revisit the original plan.
  4. Review your resources.
  5. Look for new solutions.
  6. Talk to your client.
  7. Review work processes.
  8. Check your dependencies.

How do you turnaround a failing project?

What Are the Best Ways to Turnaround My Failing IT Project?

  1. Sound The Alarm.
  2. Stop The Blaming.
  3. Determine The Current State Of The Project.
  4. Assess The Root Of The Problems.
  5. Validate The Remaining Project Tasks.
  6. Plan Your Attack.
  7. Ask For Help Where You Need It.
  8. Focus Your Team.

How do you keep a project on schedule?

How to Ensure a Project Stays on Schedule

  1. Determine the Project’s Scope and Objectives. First and foremost, a well-planned project has to have a clearly outlined scope and well-defined objectives.
  2. Coordinate and Communicate.
  3. Reserve Time for Unexpected Issues.
  4. Break Down the Project into Smaller Tasks.
  5. Review the Project’s Progress Frequently.

What is the first step you as project manager should take to get a project back on track?

Develop a new viable/realistic schedule. Develop a risk management plan. Re-evaluate resource availability. Develop new project planning documents.

What is Project Turnaround?

Project Turnaround was a private youth detention center for male young offenders between 16 to 18 years of age that operated from 1997 to 2004 in Hillsdale, Ontario, Canada.

What is your typical turnaround time?

Definition: Turnaround time is a period of time required for completing a particular process or task since the moment it is formally demanded. Turnaround time commonly refers to the amount of time measured from the submission of a request to the conclusion and delivery to the requester.

What is a shutdown project?

Shutdown projects, also known as turnarounds, planned outages or STOs are a distinctive and demanding type of project. Stakes are high, as is pressure on the schedule and project team. 40% of shutdown projects experience a cost overrun or schedule delay of more than 30 %.

What is the difference between a shutdown and a turnaround?

A shutdown is simply a disruption in the refining process. A turnaround is a planned break in production so that maintenance may be performed. The effects of a shutdown or a turnaround can make a difference in the supply available to retail fuel outlets.

What is a turnaround at a refinery?

A turnaround – which is sometimes referred to as a TAR – is a highly-expensive planned period of regeneration in a plant or refinery. During this time, an entire part of the operation is offlined whilst plants are inspected and revamped.

What does a turnaround planner do?

The turnaround planner / scheduler is the organizer; the driving force behind the effort involved in developing, communicating, reviewing, organizing and refining a workable turnaround schedule.

What is a tar planner?

During the TAR the planner reviews what orders are being worked, updates them accordingly, what orders are coming on the next shift and ensures materials and equipment are available, and meets with the next shift to give them a status from the previous shift.

What is mining shutdown work?

If you look at job listings in Western Australia, chances are that you will come across the term “shutdown jobs” or “shutdown work.” It refers to a type of job that’s related to a plant or worksite shutdown for upgrades, closing, maintenance, and so on.

Why are oil refineries shutting down?

By the peak of the weather’s impact on February 17, several refineries had announced either substantial or complete shutdowns as a result of external power outages, constrained natural gas supplies, logistical disruptions, or damage to process units.

What happens when you shut down an oil well?

At best, resuming production may require months of work, at worst, shutdown can permanently diminish the throughput of the facility. Offshore drilling platforms have their own challenges. When pumping ceases, the pressure builds up quickly, causing methane hydrates to form and to clog pipes.

How do you control a well kick?

Well-control procedures

  1. One-Circulation, or Wait-and-Weight, Method. After the kick is shut in, weight the mud to kill density and then pump out the kick fluid in one circulation using the kill mud.
  2. Two-Circulation, or Driller’s, Method.
  3. Concurrent Method.

What is a shut in payment?

Definition: Shut-in royalty is a payment made by an oil and gas lessee to the lessor in order to keep a lease in force when a well capable of producing is not utilized. This is usually because there is no market for oil or gas or no pipeline ready to receive production.

How do you calculate bottom hole pressure?

For more understanding, please follow this example below it demonstrates the relationship of BHP, SP and HP.

  1. Bottom Hole Pressure (BHP) = Surface Pressure (SP) + Hydrostatic Pressure (HP)
  2. The first case: Hydrostatic column is water which is equal to formation pressure gradient so SP is equal to 0 psi.

Is bottom hole pressure the same as reservoir pressure?

Reservoir fluid properties The reservoir fluid pressure in the rock pores is the reservoir pressure or formation pressure. Flowing bottom hole pressure is the pressure measured at the bottom of a well when oil and gas flow are produced.

What is static bottom hole pressure?

Bottom hole pressure If no fluid is moving, the well is static. The bottom hole pressure (BHP) is equal to the hydrostatic pressure (HP) on the annular side. If shut in on a kick, bottom hole pressure is equal to the hydrostatic pressure in the annulus plus the casing (wellhead or surface pressure) pressure.